Switch Operation Ticket
First, fill in the requirements of the operation and operation of the ticket.
1. Operation requirements for power outage:
1. Stop the bottom pressure first, then stop the high pressure; first stop the load and then stop the power supply; first pull the breaker, then pull the isolation switch (or the knife switch).
2. First pull the load side isolation switch, then pull the power side isolation switch.
3. Before pulling the isolating switch or the knife switch, check that the circuit breaker connected in series is in the disconnected position.
4. Stop the main switch after stopping the line switch.
5. Each operation should be checked to be in the disconnected position.
6. Do not operate 33, 44, 55, 39, 49, 59.
7. Check the load distribution of the transformer before the transformer is disassembled, and check whether the transformer in operation is overloaded.
8. Non-scheduled users: If two 10KV power supplies are present, they cannot be closed simultaneously. One must be stopped before the other is powered on.
Dispatching users: Two 10KV power supplies can be combined into a loop. Before closing the loop, release the overcurrent protection tripping plate. After closing the loop, restore the protection plate and check the loop current.
9. Apply for a complete station power outage with 21, 22.
10. During maintenance: Power off, inspect, and hang warning signs.
11. Spare heat storage standby and cold standby: Cold standby means the circuit breaker and isolating switch (knife switch) are off. Hot standby means the circuit breaker is open, but the isolating switch is closed.
2. Power transmission operation requirements:
1. First power supply, then load; first send high voltage, then low voltage; first close the main, then the line; first close the isolating switch, then the circuit breaker.
2. After operation, check that it is in the disconnected position.
3. Before connecting the isolating switch (knife switch), check that the circuit breaker is in the disconnected position.
4. Connect the power side isolation switch and then the load side isolation switch.
5. The PT secondary voltage must be normal before power is supplied.
6. After the transformer is powered on, listen for normal sounds and charge for three minutes.
7. The parallel operation of the transformer must meet the parallel conditions, and the tap changer must be in the same gear.
8. Remove temporary grounding wires and nameplates before putting equipment into operation.
9. After 401-2 and 402-2, check the transformer's secondary voltage and ensure it is normal.
10. Before operation, fill in the operation ticket and simulate the operation on the analog board. Only after verifying no errors, perform the actual operation. Two people must wear insulated boots and gloves, follow the re-twisting system, and have pre-orders and movement instructions.
Second, fill in the operation ticket:
1. Whole station overhauled:
The current mode is: first power supply, 2T operates with load; second power supply and 1T stand by.
1. Remove 201-2, power side 1# temporary grounding wire;
2. Remove 201-2, handle "no work is closed, someone is working" and "grounded" sign;
3. Remove 201-2, power side 2# temporary grounding wire;
4. Pick 202-2 handle "no work is closed, work" and "grounded" sign;
5. Check 201, 211, 245, 221, 202, 401, 402, 445 is indeed disconnected;
6. With 21, check to close;
7. And 22, check to close;
8. Together with 201-2, check to close;
9. In conjunction with 201-9, check to close;
10. Combined with 201, check to close;
11. 245-4, check to close;
12. 245-5, check to close;
13. 245, check to close;
14. With 221-5, check to close;
15. And 221-2, check to close;
16. 221, check to close;
17. With 402-2, check to close;
18. Combined with 402-5, check to close;
19. Combined with 402, check to close;
20. 445-5, check to close;
21. 445-4, check to close;
22. 445, check to close;
23. The low-voltage outlet switches, check to close;
24. Combined with low-voltage capacitor switch, check to close;
25. 22, check to close;
26. Combined with 202-2, check to close;
27. Combined with 202-9, check to close;
28. Comprehensive inspection of the quality of operation.
All station power failure operation:
2. Whole station power outage operation:
The current operation mode is: first power supply, 1T operates with full load; second power supply and 2T stand by.
1. Pull the low-voltage capacitor switch, check to disconnect;
2. Pull the low pressure each outlet is open, check to disconnect;
3. Pull 445, check to disconnect;
4. Pull 445-5, check to disconnect;
5. Pull 445-4, check to disconnect;
6. Pull 401, check to disconnect;
7. Pull 401-4, check to disconnect;
8. Pull 401-2, check to disconnect;
9. Pull 211, check to disconnect;
10. Pull 211-4, check to disconnect;
11. Pull 211-2, check to disconnect;
12. Pull 201, check to disconnect;
13. Pull 201, check to disconnect;
14. Pull 201-2, check to disconnect;
15. Pull 201-9, check to disconnect;
16. Pull 202-2, check to disconnect;
17. Pull 202-9, check to disconnect;
18. Pull 21, check to disconnect;
19. Pull 22, check to disconnect;
3. Whole station power outage operation:
The current operation mode is: second power supply, 2T operates with full load; first power supply and 1T stand by.
1. Pull the low-voltage capacitor switch, check to disconnect;
2. Pull the low pressure each outlet is open, check to disconnect;
3. Pull 445, check to disconnect;
4. Pull 445-4, check to disconnect;
5. Pull 445-5, check to disconnect;
6. Pull 402, check to disconnect;
7. Pull 402-5, check to disconnect;
8. Pull 402-2, check to disconnect;
9. Pull 221, check to disconnect;
10. Pull 221-2, check to disconnect;
11. Pull 221-5, check to disconnect;
12. Pull 245, check to disconnect;
13. Pull 245-5, check to disconnect;
14. Pull 245-4, check to disconnect;
15. Pull 201, check to disconnect;
16. Pull 201-4, check to disconnect;
17. Pull 201-9, check to disconnect;
18. Pull 201-2, check to disconnect;
19. Pull 202-9, check to disconnect;
20. Pull 202-2, check to disconnect;
21. Pull 21, check to disconnect;
22. Pull 22, check to disconnect;
23. Comprehensive inspection of the quality of operation.
4. Whole station power outage operation:
The current operation mode is: first power supply, 1T, 2T parallel operation with full load; second power supply stand by.
1. Pull the low-voltage capacitor switch, check to disconnect;
2. Pull the low pressure each outlet is open, check to disconnect;
3. Pull 445, check to disconnect;
4. Pull 445-4, check to disconnect;
5. Pull 445-5, check to disconnect;
6. Pull 401, check to disconnect;
7. Pull 401-4, check to disconnect;
8. Pull 401-2, check to disconnect;
9. Pull 402, check to disconnect;
10. Pull 402-5, check to disconnect;
11. Pull 402-2, check to disconnect;
12. Pull 221, check to disconnect;
13. Pull 221-2, check to disconnect;
14. Pull 221-5, check to disconnect;
15. Pull 245, check to disconnect;
16. Pull 245-5, check to disconnect;
17. Pull 245-4, check to disconnect;
18. Pull 221, check to disconnect;
19. Pull 211-2, check to disconnect;
20. Pull 211-4, check to disconnect;
21. Pull 201, check to disconnect;
22. Pull 201-4, check to disconnect;
23. Pull 201-9, check to disconnect;
24. Pull 201-2, check to disconnect;
25. Pull 202-9, check to disconnect;
26. Pull 202-2, check to disconnect;
27. Pull 21, check to disconnect;
28. Pull 22, check to disconnect;
29. Comprehensive inspection of the quality of operation.
5. Whole station power outage operation:
The current operation mode is: second power supply, 1T, 2T parallel operation with full load; first power supply stand by.
1. Pull the low-voltage capacitor switch, check to disconnect;
2. Pull the low pressure each outlet is open, check to disconnect;
3. Pull 445, check to disconnect;
4. Pull 445-4, check to disconnect;
5. Pull 445-5, check to disconnect;
6. Pull 401, check to disconnect;
7. Pull 401-4, check to disconnect;
8. Pull 401-2, check to disconnect;
9. Pull 402, check to disconnect;
10. Pull 402-5, check to disconnect;
11. Pull 402-2, check to disconnect;
12. Pull 221, check to disconnect;
13. Pull 221-2, check to disconnect;
14. Pull 221-5, check to disconnect;
15. Pull 245, check to disconnect;
16. Pull 245-4, check to disconnect;
17. Pull 245-5, check to disconnect;
18. Pull 221, check to disconnect;
19. Pull 221-2, check to disconnect;
20. Pull 221-4, check to disconnect;
21. Pull 202, check to disconnect;
22. Pull 202-5, check to disconnect;
23. Pull 202-9, check to disconnect;
24. Pull 202-2, check to disconnect;
25. Pull 201-9, check to disconnect;
26. Pull 201-2, check to disconnect;
27. Pull 21, check to disconnect;
28. Pull 22, check to disconnect;
29. Comprehensive inspection of the quality of operation.
Third, the whole station is transferred to maintenance:
6. Transfer the whole station to maintenance and repair, implement safety technical measures.
The current operation mode is: first power supply, 1T, 2T parallel operation with full load; second power supply stand by.
1. Pull the low-voltage capacitor switch, check to disconnect;
2. Pull the low pressure each outlet is open, check to disconnect;
3. Pull 445, check to disconnect;
4. Pull 445-4, check to disconnect;
5. Pull 445-5, check to disconnect;
6. Pull 401, check to disconnect;
7. Pull 401-4, check to disconnect;
8. Pull 401-2, check to disconnect;
9. Pull 402, check to disconnect;
10. Pull 402-5, check to disconnect;
11. Pull 402-2, check to disconnect;
12. Pull 221, check to disconnect;
13. Pull 221-2, check to disconnect;
14. Pull 221-5, check to disconnect;
15. Pull 245, check to disconnect;
16. Pull 245-5, check to disconnect;
17. Pull 245-4, check to disconnect;
18. Pull 221, check to disconnect;
19. Pull 211-2, check to disconnect;
20. Pull 211-4, check to disconnect;
21. Pull 201, check to disconnect;
22. Pull 201-4, check to disconnect;
23. Pull 201-9, check to disconnect;
24. Pull 201-2, check to disconnect;
25. Pull 202-9, check to disconnect;
26. Pull 202-2, check to disconnect;
27. Pull 21, check to disconnect;
28. Pull 22, check to disconnect;
29. Check the power side of 201-2, verify no voltage, hang 1# temporary grounding line;
30. On the operating handle of 201-2, hang “No work is blocked†and “Grounded.â€
31. Check the power supply side of 202-2, verify no voltage, and hang the 2# temporary grounding line;
32. On the operating handle of 202-2, hang “No work is closed†and “Grounded.â€
33. Comprehensive inspection of the quality of operation.
7. Transfer the whole station to maintenance and repair, implement safety technical measures.
The current operation mode is: second power supply, 1T, 2T parallel operation with full load; first power supply stand by.
1. Pull the low-voltage capacitor switch, check to disconnect;
2. Pull the low pressure each outlet is open, check to disconnect;
3. Pull 445, check to disconnect;
4. Pull 445-4, check to disconnect;
5. Pull 445-5, check to disconnect;
6. Pull 401, check to disconnect;
7. Pull 401-4, check to disconnect;
8. Pull 401-2, check to disconnect;
9. Pull 402, check to disconnect;
10. Pull 402-5, check to disconnect;
11. Pull 402-2, check to disconnect;
12. Pull 221, check to disconnect;
13. Pull 221-2, check to disconnect;
14. Pull 221-5, check to disconnect;
15. Pull 245, check to disconnect;
16. Pull 245-4, check to disconnect;
17. Pull 245-5, check to disconnect;
18. Pull 221, check to disconnect;
19. Pull 221-2, check to disconnect;
20. Pull 221-4, check to disconnect;
21. Pull 202, check to disconnect;
22. Pull 202-5, check to disconnect;
23. Pull 202-9, check to disconnect;
24. Pull 202-2, check to disconnect;
25. Pull 201-9, check to disconnect;
26. Pull 201-2, check to disconnect;
27. Pull 21, check to disconnect;
28. Pull 22, check to disconnect;
29. Check the power side of 201-2, verify no voltage, hang 1# temporary grounding line;
30. On the operating handle of 201-2, hang “No work is blocked†and “Grounded.â€
31. Check the power supply side of 202-2, verify no voltage, and hang the 2# temporary grounding line;
32. On the operating handle of 202-2, hang “No work is closed†and “Grounded.â€
33. Comprehensive inspection of the quality of operation.
Fourth, run the transformer to reverse the standby transformer (blackout and no power failure):
8. Switch the original running transformer to standby, and the original standby transformer to run.
The current operation mode is: first power supply, 2T operates with full load; second power supply and 1T stand by. Pour 1T operation, 2T stand by. (Blackout transformer)
1. Pull the low-voltage capacitor switch, check to disconnect;
2. Pull the low pressure each outlet is open, check to disconnect;
3. Pull 445, check to disconnect;
4. Pull 445-4, check to disconnect;
5. Pull 445-5, check to disconnect;
6. Pull 402, check to disconnect;
7. Pull 402-5, check to disconnect;
8. Pull 402-2, check to disconnect;
9. Pull 221, check to disconnect;
10. Pull 221-2, check to disconnect;
11. Pull 221-5, check to disconnect;
12. Pull 245, check to disconnect;
13. Pull 245-5, check to disconnect;
14. Pull 245-4, check to disconnect;
15. Combine with 211-4, check to close;
16. And 211-2, check to close;
17. 211, check to close;
18. 401-4, check to close;
19. 401-2, check to close;
20. 401, check to close;
21. 445-4, check to close;
22. 445-5, check to close;
23. Combine with each low-voltage outlet switch, check to close;
24. Combine with low-voltage capacitor switch, check to close;
25. Comprehensive inspection of the quality of operation.
9. Switch the original running transformer to standby, and the original standby transformer to run.
The current operation mode is: second power supply, 1T operates with full load; first power supply and 2T stand by. Pour 2T operation, 1T stand by. (Blackout transformer)
1. Pull the low-voltage capacitor switch, check to disconnect;
2. Pull the low-voltage outlet switch, check to disconnect;
3. Pull 445, check to disconnect;
4. Pull 445-5, check to disconnect;
5. Pull 445-4, check to disconnect;
6. Pull 401, check to disconnect;
7. Pull 401-4, check to disconnect;
8. Pull 401-2, check to disconnect;
9. Pull 211, check to disconnect;
10. Pull 211-2, check to disconnect;
11. Pull 211-4, check to disconnect;
12. Pull 245, check to disconnect;
13. Pull 245-4, check to disconnect;
14. Pull 245-5, check to disconnect;
15. Check 221, 402 is indeed disconnected;
16. And 221-5, check to close;
17. With 221-2, check to close;
18. 221, check to close;
19. Combine with 402-2, check to close;
20. Combine with 402-5, check to close;
21. Combine with 402, check to close;
22. 445-5, check to close;
23. 445-4, check to close;
24. 445, check to close;
25. The low-voltage outlet switches, check to close;
26. Combine with low-voltage capacitor switch, check to close;
27. Check the operation of 2T, check whether there is any overload;
28. Comprehensive inspection of the quality of operation.
10. Switch the original running transformer to standby, and the original standby transformer to run.
The current operation mode is: first power supply, 1T operates with full load; second power supply and 2T stand by. Pour 2T operation, 1T stand by. Parallel transformer.
1. Check whether 1T and 2T meet the parallel conditions, and whether the tap changer gear position is the same;
2. Check 245, 221, 402 is indeed disconnected;
3. 245-4, check to close;
4. 245-5, check to close;
5. 245, check to close;
6. Combine with 221-5, check to close;
7. And 221-2, check to close;
8. 221, check to close, the transformer sounds normal, charge for three minutes;
9. With 402-2, check to close, check 2T secondary voltage is normal;
10. Combine with 402-5, check to close;
11. With 402, check to close;
12. Check 1T, 2T load distribution;
13. Pull 401, check to disconnect;
14. Check 2T for overload;
15. Pull 401-4, check to disconnect;
16. Pull 401-2, check to disconnect;
17. Pull 211, check to disconnect;
18. Pull 211-4, check to disconnect;
19. Pull 211-2, check to disconnect;
20. Comprehensive inspection of the quality of operation.
11. Switch the original running transformer to standby, and the original standby transformer to run.
The current operation mode is: second power supply, 2T operates with full load; first power supply and 1T stand by. Pour 1T operation, 2T stand by. (Parallel transformer)
1. Check whether 1T and 2T meet the parallel conditions, and whether the tap changer gear position is the same;
2. Check 245, 221, 401 is indeed disconnected;
3. 245-4, check to close;
4. 245-5, check to close;
5. 245, check to close;
6. With 211-4, check to close;
7. In conjunction with 211-2, check to close;
8. 211, check to close, the transformer sound is normally charged for three minutes;
9. Combine with 401-2, check to close, check 2T secondary voltage is normal;
10. 401-4 to check to close;
11. 401, check to close;
12. Check 1T, 2T load distribution;
13. Pull 402, check to disconnect;
14. Check 2T for overload;
15. Pull 402-5, check to disconnect;
16. Pull 402-2, check to disconnect;
17. Pull 221, check to disconnect;
18. Pull 221-5, check to disconnect;
19. Pull 221-2, check to disconnect;
20. Put 202 over-current protection platen, run the power supply to back-up power supply;
21. Comprehensive inspection of the quality of operation.