1. Power Outage Operation Requirements
1. First, stop the low pressure, then the high pressure; first stop the load, then the power supply; first pull the circuit breaker, then the isolating switch (or knife switch).
2. Pull the load side isolating switch first, then the power side isolating switch.
3. Before pulling the isolating switch or knife switch, ensure that the circuit breaker connected in series is in the disconnected position.
4. After stopping the line switch, stop the main switch.
5. Each operation should be confirmed to be in the disconnected position.
6. Do not operate 33, 44, 55, 39, 49, 59.
7. Check the transformer's load distribution before disassembling it and confirm whether the operating transformer is overloaded.
8. For non-scheduled users: if there are two 10KV power supplies, they cannot be closed simultaneously and must be stopped before being reconnected.
For dispatching users: two 10KV power supplies can be looped together. Before closing the loop, release the overcurrent protection trip plate. After the loop is closed, restore the protection plate and check the loop current.
9. Apply for a complete station power outage for 21, 22.
10. During maintenance: power off, inspect, and hang warning signs.
11. Cold and hot standby: cold standby means the circuit breaker and isolating switch are in the off position; hot standby means the circuit breaker is open while the isolating switch is closed.
2. Power Transmission Operation Requirements
1. First power on, then load; first send high voltage, then low voltage; first close the main switch, then the line; first close the isolating switch, then the circuit breaker.
2. After the operation, confirm that it is in the disconnected position.
3. Before connecting the isolating switch, check that the circuit breaker is in the disconnected position.
4. Connect the power side isolating switch first, then the load side isolating switch.
5. The PT secondary voltage must be normal before power is supplied.
6. After the transformer is powered on, listen for normal sounds and charge it for three minutes.
7. Ensure the parallel operation conditions of the transformer are met, and the tap changer is in the same gear.
8. Remove temporary grounding wires and nameplates before equipment is put into service.
9. After 401-2 and 402-2, check the secondary voltage of the transformer and confirm it is normal.
10. Before operation, fill in the operation ticket and simulate the operation on the analog board. Only after verifying no errors, proceed with actual operations. Two people should wear insulated boots and gloves, perform the re-check system, and follow the pre-order and movement procedures.
Second, fill in the operation ticket.
1. Complete station overhaul transfer
The current mode is: first power supply, 2T operates with load; second power supply and 1T stand by.
1. Remove 201-2, power supply side 1# temporary grounding wire;
2. Remove 201-2, handle "No work is closed, someone is working" and "Grounded" sign;
3. Remove 201-2, power supply side 2# temporary grounding wire;
4. Place 202-2 handle "No work is closed, work" and "Grounded" sign;
5. Confirm that 201, 211, 245, 221, 202, 401, 402, 445 are indeed disconnected;
6. Close 21;
7. Close 22;
8. Close 201-2;
9. Close 201-9;
10. Close 201;
11. Close 245-4;
12. Close 245-5;
13. Close 245;
14. Close 221-5;
15. Close 221-2;
16. Close 221;
17. Close 402-2;
18. Close 402-5;
19. Close 402;
20. Close 445-5;
21. Close 445-4;
22. Close 445;
23. Close low-voltage outlet switches;
24. Close low-voltage capacitor switch;
25. Close 22;
26. Close 202-2;
27. Close 202-9;
28. Perform a comprehensive quality inspection of the operation.
Complete station power outage operation
2. Complete station power outage operation
The current operation mode is: first power supply, 1T operates with full load; second power supply and 2T stand by.
1. Open low-voltage capacitor switch, confirm disconnection;
2. Open each low-pressure outlet, confirm disconnection;
3. Open 445, confirm disconnection;
4. Open 445-5, confirm disconnection;
5. Open 445-4, confirm disconnection;
6. Open 401, confirm disconnection;
7. Open 401-4, confirm disconnection;
8. Open 401-2, confirm disconnection;
9. Open 211, confirm disconnection;
10. Open 211-4, confirm disconnection;
11. Open 211-2, confirm disconnection;
12. Open 201, confirm disconnection;
13. Open 201, confirm disconnection;
14. Open 201-2, confirm disconnection;
15. Open 201-9, confirm disconnection;
16. Open 202-2, confirm disconnection;
17. Open 202-9, confirm disconnection;
18. Open 21, confirm disconnection;
19. Open 22, confirm disconnection;
3. Complete station power outage operation
The current operation mode is: second power supply, 2T operates with full load; first power supply and 1T stand by.
1. Open low-voltage capacitor switch, confirm disconnection;
2. Open each low-pressure outlet, confirm disconnection;
3. Open 445, confirm disconnection;
4. Open 445-4, confirm disconnection;
5. Open 445-5, confirm disconnection;
6. Open 402, confirm disconnection;
7. Open 402-5, confirm disconnection;
8. Open 402-2, confirm disconnection;
9. Open 221, confirm disconnection;
10. Open 221-2, confirm disconnection;
11. Open 221-5, confirm disconnection;
12. Open 245, confirm disconnection;
13. Open 245-5, confirm disconnection;
14. Open 245-4, confirm disconnection;
15. Open 201, confirm disconnection;
16. Open 201-4, confirm disconnection;
17. Open 201-9, confirm disconnection;
18. Open 201-2, confirm disconnection;
19. Open 202-9, confirm disconnection;
20. Open 202-2, confirm disconnection;
21. Open 21, confirm disconnection;
22. Open 22, confirm disconnection;
23. Perform a comprehensive quality inspection of the operation.
4. Complete station power outage operation
The current operation mode is: first power supply, 1T, 2T operate in parallel with full load; second power supply stands by.
1. Open low-voltage capacitor switch, confirm disconnection;
2. Open each low-pressure outlet, confirm disconnection;
3. Open 445, confirm disconnection;
4. Open 445-4, confirm disconnection;
5. Open 445-5, confirm disconnection;
6. Open 401, confirm disconnection;
7. Open 401-4, confirm disconnection;
8. Open 401-2, confirm disconnection;
9. Open 402, confirm disconnection;
10. Open 402-5, confirm disconnection;
11. Open 402-2, confirm disconnection;
12. Open 221, confirm disconnection;
13. Open 221-2, confirm disconnection;
14. Open 221-5, confirm disconnection;
15. Open 245, confirm disconnection;
16. Open 245-5, confirm disconnection;
17. Open 245-4, confirm disconnection;
18. Open 221, confirm disconnection;
19. Open 211-2, confirm disconnection;
20. Open 211-4, confirm disconnection;
21. Open 201, confirm disconnection;
22. Open 201-4, confirm disconnection;
23. Open 201-9, confirm disconnection;
24. Open 201-2, confirm disconnection;
25. Open 202-9, confirm disconnection;
26. Open 202-2, confirm disconnection;
27. Open 21, confirm disconnection;
28. Open 22, confirm disconnection;
29. Perform a comprehensive quality inspection of the operation.
5. Complete station power outage operation
The current operation mode is: second power supply, 1T, 2T operate in parallel with full load; first power supply stands by.
1. Open low-voltage capacitor switch, confirm disconnection;
2. Open each low-pressure outlet, confirm disconnection;
3. Open 445, confirm disconnection;
4. Open 445-4, confirm disconnection;
5. Open 445-5, confirm disconnection;
6. Open 401, confirm disconnection;
7. Open 401-4, confirm disconnection;
8. Open 401-2, confirm disconnection;
9. Open 402, confirm disconnection;
10. Open 402-5, confirm disconnection;
11. Open 402-2, confirm disconnection;
12. Open 221, confirm disconnection;
13. Open 221-2, confirm disconnection;
14. Open 221-5, confirm disconnection;
15. Open 245, confirm disconnection;
16. Open 245-4, confirm disconnection;
17. Open 245-5, confirm disconnection;
18. Open 221, confirm disconnection;
19. Open 221-2, confirm disconnection;
20. Open 221-4, confirm disconnection;
21. Open 202, confirm disconnection;
22. Open 202-5, confirm disconnection;
23. Open 202-9, confirm disconnection;
24. Open 202-2, confirm disconnection;
25. Open 201-9, confirm disconnection;
26. Open 201-2, confirm disconnection;
27. Open 21, confirm disconnection;
28. Open 22, confirm disconnection;
29. Perform a comprehensive quality inspection of the operation.
Third, transfer the entire station to maintenance.
6. Transfer the entire station to maintenance and implement safety technical measures.
The current operation mode is: first power supply, 1T and 2T operate in parallel with full load; second power supply stands by.
1. Open low-voltage capacitor switch, confirm disconnection;
2. Open each low-pressure outlet, confirm disconnection;
3. Open 445, confirm disconnection;
4. Open 445-4, confirm disconnection;
5. Open 445-5, confirm disconnection;
6. Open 401, confirm disconnection;
7. Open 401-4, confirm disconnection;
8. Open 401-2, confirm disconnection;
9. Open 402, confirm disconnection;
10. Open 402-5, confirm disconnection;
11. Open 402-2, confirm disconnection;
12. Open 221, confirm disconnection;
13. Open 221-2, confirm disconnection;
14. Open 221-5, confirm disconnection;
15. Open 245, confirm disconnection;
16. Open 245-5, confirm disconnection;
17. Open 245-4, confirm disconnection;
18. Open 221, confirm disconnection;
19. Open 211-2, confirm disconnection;
20. Open 211-4, confirm disconnection;
21. Open 201, confirm disconnection;
22. Open 201-4, confirm disconnection;
23. Open 201-9, confirm disconnection;
24. Open 201-2, confirm disconnection;
25. Open 202-9, confirm disconnection;
26. Open 202-2, confirm disconnection;
27. Open 21, confirm disconnection;
28. Open 22, confirm disconnection;
29. Inspect the power side of 201-2, confirm no voltage, and install 1# temporary grounding wire;
30. Hang “No work is blocked†and “Grounded†signs on the operating handle of 201-2;
31. Inspect the power supply side of 202-2, confirm no voltage, and install 2# temporary grounding wire;
32. Hang “No work is closed†and “Grounded†signs on the operating handle of 202-2;
33. Perform a comprehensive quality inspection of the operation.
7. Transfer the entire station to maintenance and implement safety technical measures.
The current operation mode is: second power supply, 1T and 2T operate in parallel with full load; first power supply stands by.
1. Open low-voltage capacitor switch, confirm disconnection;
2. Open each low-pressure outlet, confirm disconnection;
3. Open 445, confirm disconnection;
4. Open 445-4, confirm disconnection;
5. Open 445-5, confirm disconnection;
6. Open 401, confirm disconnection;
7. Open 401-4, confirm disconnection;
8. Open 401-2, confirm disconnection;
9. Open 402, confirm disconnection;
10. Open 402-5, confirm disconnection;
11. Open 402-2, confirm disconnection;
12. Open 221, confirm disconnection;
13. Open 221-2, confirm disconnection;
14. Open 221-5, confirm disconnection;
15. Open 245, confirm disconnection;
16. Open 245-4, confirm disconnection;
17. Open 245-5, confirm disconnection;
18. Open 221, confirm disconnection;
19. Open 221-2, confirm disconnection;
20. Open 221-4, confirm disconnection;
21. Open 202, confirm disconnection;
22. Open 202-5, confirm disconnection;
23. Open 202-9, confirm disconnection;
24. Open 202-2, confirm disconnection;
25. Open 201-9, confirm disconnection;
26. Open 201-2, confirm disconnection;
27. Open 21, confirm disconnection;
28. Open 22, confirm disconnection;
29. Inspect the power side of 201-2, confirm no voltage, and install 1# temporary grounding wire;
30. Hang “No work is blocked†and “Grounded†signs on the operating handle of 201-2;
31. Inspect the power supply side of 202-2, confirm no voltage, and install 2# temporary grounding wire;
32. Hang “No work is closed†and “Grounded†signs on the operating handle of 202-2;
33. Perform a comprehensive quality inspection of the operation.
Fourth, run the transformer to reverse the standby transformer (blackout and no power failure)
8. Switch the original running transformer to standby, and the original standby transformer to run.
The current operation mode is: first power supply, 2T operates with full load; second power supply and 1T stand by. Run 1T, 2T stand by. (Blackout transformer)
1. Open low-voltage capacitor switch, confirm disconnection;
2. Open each low-pressure outlet, confirm disconnection;
3. Open 445, confirm disconnection;
4. Open 445-4, confirm disconnection;
5. Open 445-5, confirm disconnection;
6. Open 402, confirm disconnection;
7. Open 402-5, confirm disconnection;
8. Open 402-2, confirm disconnection;
9. Open 221, confirm disconnection;
10. Open 221-2, confirm disconnection;
11. Open 221-5, confirm disconnection;
12. Open 245, confirm disconnection;
13. Open 245-5, confirm disconnection;
14. Open 245-4, confirm disconnection;
15. Close 211-4, confirm closure;
16. Close 211-2, confirm closure;
17. Close 211, confirm closure;
18. Close 401-4, confirm closure;
19. Close 401-2, confirm closure;
20. Close 401, confirm closure;
21. Close 445-4, confirm closure;
22. Close 445-5, confirm closure;
23. Close each low-voltage outlet switch, confirm closure;
24. Close low-voltage capacitor switch, confirm closure;
25. Perform a comprehensive quality inspection of the operation.
9. Switch the original running transformer to standby, and the original standby transformer to run.
The current operation mode is: second power supply, 1T operates with full load; first power supply and 2T stand by. Run 2T, 1T stand by. (Blackout transformer)
1. Open low-voltage capacitor switch, confirm disconnection;
2. Open low-voltage outlet switch, confirm disconnection;
3. Open 445, confirm disconnection;
4. Open 445-5, confirm disconnection;
5. Open 445-4, confirm disconnection;
6. Open 401, confirm disconnection;
7. Open 401-4, confirm disconnection;
8. Open 401-2, confirm disconnection;
9. Open 211, confirm disconnection;
10. Open 211-2, confirm disconnection;
11. Open 211-4, confirm disconnection;
12. Open 245, confirm disconnection;
13. Open 245-4, confirm disconnection;
14. Open 245-5, confirm disconnection;
15. Confirm that 221 and 402 are indeed disconnected;
16. Close 221-5, confirm closure;
17. Close 221-2, confirm closure;
18. Close 221, confirm closure;
19. Close 402-2, confirm closure;
20. Close 402-5, confirm closure;
21. Close 402, confirm closure;
22. Close 445-5, confirm closure;
23. Close 445-4, confirm closure;
24. Close 445, confirm closure;
25. Close low-voltage outlet switches, confirm closure;
26. Close low-voltage capacitor switch, confirm closure;
27. Check 2T’s operation and confirm no overload;
28. Perform a comprehensive quality inspection of the operation.
10. Switch the original running transformer to standby, and the original standby transformer to run.
The current operation mode is: first power supply, 1T operates with full load; second power supply and 2T stand by. Run 2T, 1T stand by. Parallel transformer
1. Check if 1T and 2T meet the parallel conditions, and ensure their tap changers are in the same gear;
2. Confirm that 245, 221, and 402 are indeed disconnected;
3. Close 245-4, confirm closure;
4. Close 245-5, confirm closure;
5. Close 245, confirm closure;
6. Close 221-5, confirm closure;
7. Close 221-2, confirm closure;
8. Close 221, confirm closure, and ensure the transformer sounds normal and charges for three minutes;
9. Close 402-2, confirm closure, and check that 2T’s secondary voltage is normal;
10. Close 402-5, confirm closure;
11. Close 402, confirm closure;
12. Check the load distribution of 1T and 2T;
13. Open 401, confirm disconnection;
14. Check 2T for overload;
15. Open 401-4, confirm disconnection;
16. Open 401-2, confirm disconnection;
17. Open 211, confirm disconnection;
18. Open 211-4, confirm disconnection;
19. Open 211-2, confirm disconnection;
20. Perform a comprehensive quality inspection of the operation.
11. Switch the original running transformer to standby, and the original standby transformer to run.
The current operation mode is: second power supply, 2T operates with full load; first power supply and 1T stand by. Run 1T, 2T stand by. (Parallel transformer)
1. Check if 1T and 2T meet the parallel conditions, and ensure their tap changers are in the same gear;
2. Confirm that 245, 221, and 401 are indeed disconnected;
3. Close 245-4, confirm closure;
4. Close 245-5, confirm closure;
5. Close 245, confirm closure;
6. Close 211-4, confirm closure;
7. Close 211-2, confirm closure;
8. Close 211, confirm closure, and ensure the transformer sounds normal and charges for three minutes;
9. Close 401-2, confirm closure, and check that 2T’s secondary voltage is normal;
10. Close 401-4, confirm closure;
11. Close 401, confirm closure;
12. Check the load distribution of 1T and 2T;
13. Open 402, confirm disconnection;
14. Check 2T for overload;
15. Open 402-5, confirm disconnection;
16. Open 402-2, confirm disconnection;
17. Open 221, confirm disconnection;
18. Open 221-5, confirm disconnection;
19. Open 221-2, confirm disconnection;
20. Put the over-current protection plate back, and run the power supply to the backup power supply;
21. Perform a comprehensive quality inspection of the operation.
Ultra Thin Switch Power Supply
Switch Power Supply,Switch Mode Power Supply,Switch SMPS LED Power Supply,Ultra Thin Switching Power Supply
FOSHAN SHUNDE KELICHENG POWER SUPPLY TECHNOLOGY CO., LTD , https://www.kelicpower.com